Inroads · C3 Toronto · Planning Center data · Jan 1 – Aug 31, pulled Sep 1 2026
The 2026 campus-and-team workflows, measured against the onboarding flows they replaced. Downtown, Midtown & Hamilton; year-to-date versus the same eight months of 2025.
Every card in a 2026 Teams workflow, as of this morning. Completed = connection made (they're on the team); removed = connection not made. 304 onboardings have completed through the new flows (283 unique people), 169 are mid-pipeline, and a further 139 joined this year through the handful of old flows still in use¹.
| Team | Sign-ups | Joined | In progress | Not made | Pipeline | Overdue |
|---|
Pipeline bar: joined · in progress · not made. Creative isn’t listed — its 73 sign-ups this year still run through the 2024-era flow (see watch list).
Median journey from sign-up to joining the team dropped from 58 days to 42. The share of sign-ups fully onboarded within 60 days rose from 27% to 36% — and Downtown, the slowest campus last year, cut its median in half.
Of the cards that reached a decision, 65% ended with a person on a team, up from 55% for last year's Jan–Aug cohort. Completions are also accelerating through the year — August was the best month so far.
Yes by design, not always in practice. Every 2026 flow opens with an automatic welcome email and then a Team Interest Call as the first human step — a structure the old flows didn't guarantee. Right now, though, there's a backlog:
One focused call blitz clears it. The 22 call-stage people are the warmest leads in the pipeline — a person per campus making calls this week would zero the backlog. (Planning Center doesn't expose per-step timestamps, so overdue flags and step position are the honest proxy for call timeliness.)
Scheduled serving slots on a typical Sunday are up at all three campuses — combined +22% year-over-year (Easter excluded). Midtown's teams grew the most, +44%.
Attendance quality baseline: in the January 2025 Downtown sample, 81% of scheduled volunteers confirmed and 7% declined. A matching 2026 confirmation pull is the natural next measure to add to the dashboard.
¹ “Placed on teams” counts workflow-card completions recorded Jan–Aug of each year: 2025 = 225 completions on the legacy onboarding flows; 2026 = 308 on the new Teams flows + 139 on legacy flows still in use. By unique people, 333 individuals have completed a team workflow so far in 2026 vs 338 in all of 2025.
Sources: Planning Center People workflow cards (1,835 cards across 55 team workflows, pulled Sep 1 2026) and Planning Center Services plans (first-Sunday samples, Jan–Aug 2025 & 2026, all three Sunday service types). 2025 figures use the Jan–Aug cohort of cards created in the legacy “TEAM ONBOARDING” flows; 2026 figures use the “2026: Teams” flows plus Downtown Security. CDMX flows excluded.
Known gaps: an API pagination quirk left ~130 legacy cards unretrieved (mostly DT Kids and Creative), which slightly understates 2025 — the direction of every comparison is unaffected. Easter fell on a sampled Sunday in 2026 but not 2025, so serving averages exclude that sample. Planning Center does not expose per-step history, so call timeliness is proxied by current step + overdue flags. Completed = “connection made” per the team's convention; removed cards are counted as “not made”, and 169 cards are still undecided.